Product information
Description
The Woodridge is the two-storey set: an upper and a lower fort connected by an elevated tunnel, so the structure plays as two dens rather than one platform. It is the second-largest set in the Kids Play range after the Skyfort II.
What’s included
- Upper and lower forts
- Elevated connecting tunnel — the hide-and-seek spot
- Rock climbing wall
- 3 m wave slide
- Swing beam with two belt swings and a trapeze
- Built-in bench
Will it fit your garden?
- Assembled size: 5.9 × 4.8 m, 3.6 m high
- Safe play zone: 9.9 × 8.8 m
- Swing beam height: 2.08 m
- Weight: 324 kg
Plan for 9.9 × 8.8 m of clear, level ground — 2 m of run-off on every side of the structure.
Cedar, and why it matters
All-cedar build. The wood’s own oils protect against rot and insects — no pressure treatment — and one coat of sealant a year keeps the colour.
Assembly
Four boxes plus the slide, 324 kg. Two people, 14–16 hours — a committed weekend, with 3D guidance in the BILT app. Our team assembles it in a day for €990.
Delivery and warranty
Free EU delivery from our warehouse in Poland. 5-year warranty for home gardens; public or commercial installation voids it.
Specifications
| Assembled Dimensions | |||
|---|---|---|---|
| Width | Depth | Height | Weight |
| 5,9m | 4,8m | 3,6m | 324kg |
| Packaging information | ||||
|---|---|---|---|---|
| Width | Depth | Height | Weight | |
| Box 1 | 2,33m | 0,56m | 0.19m | 69kg |
| Box 2 | 2,33m | 0,56m | 0,21m | 81kg |
| Box 3 | 2,33m | 0,56m | 0,22m | 78kg |
| Box 4 | 2,33m | 0,56m | 0,17m | 81kg |
| Slide | 3m | 0,4m | 0,65m | 16kg |
This product is intended for RESIDENTIAL USE ONLY. Any use of this product outside of a residential setting will make the product warranty null and void.
Construction
The swing set is made from 100% cedar. With small, tight knot structure, your lumber will be less likely to develop small cracks emanating from knots. In laboratory testing, our durable cedar wood proved to be rot resistant and highly resistant to natural decay. All lumber is pre-stained for a smooth and clear appearance, as well as cut and stamped with the part number to help speed up the building process. Some pilot-hole drilling may be required.